Millennium Coatings
Millennium Coatings
  • Home
  • About Us
  • Information and services
  • Gallery
  • Contact Us
  • Blog
  • More
    • Home
    • About Us
    • Information and services
    • Gallery
    • Contact Us
    • Blog
  • Home
  • About Us
  • Information and services
  • Gallery
  • Contact Us
  • Blog

Our services

We are an established business based in Nether Heage close to Derby/Nottingham junction 28 of the M1

 

  • ISO9001:2015
  • 20,000 sq ft of modern premises
  • Environmentally friendly
  • Preparation facilities
  • Powder Coating Pre-Treatment Plant (PHOS-PREP)
  • Multi - Stage Aluminium Pre-Treatment Process
  • Full Shot Blasting Facilities
  • Cold Galvanising System
  • Powder Coating to any specification & Colour using Fully Automated Plant & Static Box Ovens
  • Competitive prices & Guaranteed Quality
  • Flexible lead times
  • Fully Qualified & Experienced Staff

Pre-Treatment Plant facilities

 

Powder Coating Pre-Treatment Plant multi stage Process (PHOS-PREP):

This is a Qualicoat approved process. 

PHOS-PREP PP 932 Low Foaming Heavy Duty Cleaner

The PHOS-PREP® PP 932 sulphuric acid based cleaner/etch has been  specially formulated to remove scales and tarnish from aluminium to  produce a chemically clean surface.

PHOS-PREP PP 920 NF Dry-In-Place Polymer

PHOS-PREP® PP 920 is a “dry-in-place” replacement for chromate-based  products for the pre-treatment of aluminium and aluminium alloys.

PP920 provides excellent adhesion and corrosion resistance after subsequent painting or powder coating.

Can accommodate upto 6.5 meters.

Cold galvanising System

 

The environmentally friendly cold galvanising system is a one pack coating that provides cathodic protection to ferrous metals and an ideal primer for powder coating. 

It can be applied by brushing, spraying and as an aerosol, it  is therefore ideal for all ferrous metals and avoids the need for  hot-dip galvanisation or metallisation

The system, used is known as the Zinga system, is not toxic and can  be used with potable water, in accordance with the standard BS6920.

This system is an alternative to Zinc hot dip galvanising where the  waste product is hazardous and has to be disposed in accordance with the  statutory regulations.

Powder Coating Facilities

     

Our on line powder coating facility is 100 metres in length and is capable of handling items  up to 6.5 meters in length.

Our newly installed plant has very efficient burners, combined with the track length will allow a faster through put and  increased capacity.

There are three static ovens capable of dealing with items up to 7.5 metres in length.

All the ovens are equipped with the latest extraction equipment  making for a comfortable environment to work  in.

The Powder Coating Finishes include:

  • Standard Polyester
  • Architectural Grade
  • Anti-Graffiti
  • Nylon warm to the hand
  • Coastal C4

Packaging and wrapping

      

  • Shrink wrap
  • Pallet wrap
  • Cardboard
  • Foam



Collection and Delivery


  • Within the UK
  • Maximum weight 1.5 tonnes
  • Maximum length 5 metre’s
  • Maximum width 2 metres

Our On line control Panel

We have invested in this state of the art touch screen on line control panel. This keeps the oven to the correct curing temperature, as this is critical to ensure the powder is fully cured. This also helps to reduce our carbon footprint. 


Copyright © 2022 Millennium Coatings - All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept